1/5 scale K2 black panther tank
#151
Thread Starter
Connect air compressor to anti-vibration silicon pad and install on the back of shell storage storage storage
Connect air compressor to anti-vibration silicon pad and install on the back of shell storage storage storage
Operate the air compressor to check the vibration level
Operate the air compressor to check the vibration level
Air compressor noise is expected to be soundproof
Front Side Skirt Fixing Pin Position Move (Before)
Front Side Skirt Fixing Pin Position Move (After)
Installation of the artillery shield upper spacer and identification friend or foe
Installation of the artillery shield upper spacer and identification friend or foe
Complete installation of main Gun unit on turret
Check cover status when main gun is operated (Down position)
Check cover status when main gun is operated (Up posion)
Gunner Hatch Movement Test
Toolbox Door Test (Left)
Toolbox Door Test (Left)
Shell Supply Door Test
Shell Supply Door Test
Toolbox Door Test (Right)
Test of rotational motion of observation equipment for commanders
Hatches for Commander
Turret Shape Complete
Turret shape completed - Details after first painting
Remove the top plate to the right of the electrical wiring
Remove the top plate to the right of the electrical wiring
Check electrical components inventory and order any missing parts
Last edited by PE YOUNG; 10-22-2023 at 02:29 PM.
#152
Thread Starter
Main control panel manufactured complete
Main control panel arrangement complete
The main wires started to connect
The wire connection work is very complicated
The wire connection work is very complicated
Main panel unit placed on the right rear side of the body
Main panel unit placed on the right rear side of the body
Main panel unit placed on the right rear side of the body
The cover for the main panel unit works like a picture
We are going on a business trip to install three baseball machines that we have requested to manufacture next week, so there will be no work in October.
I expect it to be completed in November.
The following users liked this post:
tankme (10-22-2023)
#153
Thread Starter
Teaser of Episodes 32.
Before officially publishing the following tasks, I displayed the current work briefly.
Overall form of turret completed last time
Overall shape of turret completed last time (estimate size compared to 500CC can beer)
Wiring and arranging electronics on the body
Configuring electrical contact switches to operate on mechanical action
Engine exhaust corrugated duct
Engine exhaust muffler
Engine heat exhaust fans
Electronic component arrangement
Electronic component arrangement
Review generator output
Replace with a large fuel tank
Front manual charging wire connector
Side skirt support
Side skirt support (middle position)
Side skirt support (front right position)
Side skirt support (rear position)
Side skirt support (rear position)
Before officially publishing the following tasks, I displayed the current work briefly.
Overall form of turret completed last time
Overall shape of turret completed last time (estimate size compared to 500CC can beer)
Wiring and arranging electronics on the body
Configuring electrical contact switches to operate on mechanical action
Engine exhaust corrugated duct
Engine exhaust muffler
Engine heat exhaust fans
Electronic component arrangement
Electronic component arrangement
Review generator output
Replace with a large fuel tank
Front manual charging wire connector
Side skirt support
Side skirt support (middle position)
Side skirt support (front right position)
Side skirt support (rear position)
Side skirt support (rear position)
Last edited by PE YOUNG; 10-29-2023 at 07:37 PM.
The following users liked this post:
Panther F (10-30-2023)
#154
Thread Starter
Heat exhaust interlocking control
In this version, two of the three heat exhaust fans at the back of the tank can be proportionally controlled by engine room temperature in order to maximize the electric energy of the generator using a brushless motor linked to the engine shaft.
When the engine is started, one out of three is always operated, and when the engine room temperature exceeds 60 degrees Celsius, fan 2 and fan 3 are operated sequentially.
If it goes below 60 degrees, the fan stops and the excess energy is stored in the battery.
When the engine is started, one out of three is always operated, and when the engine room temperature exceeds 60 degrees Celsius, fan 2 and fan 3 are operated sequentially.
If it goes below 60 degrees, the fan stops and the excess energy is stored in the battery.
#155
Thread Starter
The K2 tank is being worked on in detail by division.
Headlight connections, left and right turn signals, etc
Dummy rear camera
Left taillights and exhaust muffler
Right taillights
Front light and binding bolts
Driver Hatch, Stopper, Light Sensor
APU DOOR AND DOOR HINGE
Door supporter
Headlight connections, left and right turn signals, etc
Dummy rear camera
Left taillights and exhaust muffler
Right taillights
Front light and binding bolts
Driver Hatch, Stopper, Light Sensor
APU DOOR AND DOOR HINGE
Door supporter
Last edited by PE YOUNG; 11-03-2023 at 06:43 PM.
#156
Thread Starter
Episode 32: Body Electrical Wiring and Detail Work
The video clips of the various detailed tasks released in the previous teaser are shown below.
In this work, power generation using engine power, various lights, and details were made on the upper part of the body.
Installation of side skirt supporters
Installation of side skirt supporters
Installation of side skirt supporters
Installation of side skirt supporters
Installation of side skirt supporters
Installation of side skirt supporters
Installation of side skirt supporters
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Engine room heat exhaust fan operation
Engine room heat exhaust fan operation
Engine room heat exhaust fan operation
APU Switch test for exhaust system
Exhaust for muffler only
Engine room heat exhaust fan operation
Replace with a large fuel tank
Electronic component arrangement
In this work, power generation using engine power, various lights, and details were made on the upper part of the body.
Installation of side skirt supporters
Installation of side skirt supporters
Installation of side skirt supporters
Installation of side skirt supporters
Installation of side skirt supporters
Installation of side skirt supporters
Installation of side skirt supporters
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Manufacture of exhaust gas mufflers
Engine room heat exhaust fan operation
Engine room heat exhaust fan operation
Engine room heat exhaust fan operation
APU Switch test for exhaust system
Exhaust for muffler only
Engine room heat exhaust fan operation
Replace with a large fuel tank
Electronic component arrangement
Last edited by PE YOUNG; 11-05-2023 at 04:01 AM.
The following users liked this post:
tankme (11-05-2023)
#157
Thread Starter
Electronic component arrangement
Electronic component and fan arrangement
Electronic component arrangement
Headlight operation test
Headlight operation test
Headlight operation test
Headlight operation test, this headlight can be turned on/off by illumination sensor and controller
the production of headlights
the production of headlights
the production of headlights
Headlight Operation Test
Headlight Operation Test
Headlight Operation Test
Installation of headlight supplementary tape
Installation of headlight supplementary tape
Headlight Operation Test
Headlight Operation Test
Headlight Operation Test
Headlight Operation Test
Installation of contact switch for brake
Installation of contact switch for brake
Positioning the receiver and control switch
Installation of the slipring and the left and right blinkers
Installation of the four contact switches on the left and right blinkers
Installation of the four contact switches on the left and right blinkers
#158
Thread Starter
Wire connection operation
Wire connection operation
Wire connection operation
Wire connection operation
Wire connection operation
Wire connection operation
Wire connection operation
Wire connection operation
Wire connection operation
Confirmation of the slipring final plan
Position all control switches and receivers on the left front top
Position all control switches and receivers on the left front top
Alignment of slip ring wires
Alignment of slip ring wires
Alignment of slip ring wires
Production of rear light assembly
Production of rear light assembly
Production of rear light assembly
Production of rear light assembly
Determine the position of attachment to the rear light assembly
Determine the position of attachment to the rear light assembly
Production of rear light assembly
Attaching the rear light assembly
Attaching the rear light assembly
Attaching the rear light assembly
#159
Thread Starter
Temperature sensor for engine compartment exhaust fan control
Temperature sensor for engine compartment exhaust fan control
Front left and right blinkers manufactured
Front left and right blinkers manufactured
Front left and right blinkers manufactured
Front left and right blinkers manufactured
Front left and right blinkers manufactured
Front left and right blinkers manufactured
Front left and right blinkers manufactured
Front left and right blinkers manufactured
Front left and right blinkers manufactured
Front left and right blinkers manufactured
power supply for testing
Brake light test
Brake light test
Left and right contact switch test
Right blinker test
Right blinker test
Left blink test
Left blink test
Blinking test
Blinking test
Test the operation of the receiver and control switch
Test the operation of the receiver and control switch
Charging to manual charging port
#160
Thread Starter
Installation of illumination sensor exposure
Fixed the illumination sensor
Installing Receiver Antenna
Body Detail Operation
Body Detail Operation
Installing Stoppers for Driver Hatch
APU Cover Handle Welding
APU Cover Handle Welding
APU Cover Handle Welding
APU Cover Handle Complete
Rear reflector operation
Rear reflector operation
Detail Operation
Detail Operation
Detail Operation
Detail Operation
Detail Operation
Detail Operation
Detail Operation
Detail Operation
Detail Operation
Detail Operation
Detail Operation
Detail Operation
Detail Operation
#161
Thread Starter
Next week, we plan to complete the turret detail again.
Working on details
Working on details
Working on details - refueling system
Working on details
Remove unnecessary holes
Remove unnecessary holes
Working on details
Working on details
Working on details
Working on details
Working on details
Working on details
Working on details
Working on details
Working on details
Working on details
Inspection of the refueling system
Inspection of the refueling system
Completion of body details except for additional protective blocks
This is the end of this episode and the video about this work is as follows.
Working on details
Working on details
Working on details - refueling system
Working on details
Remove unnecessary holes
Remove unnecessary holes
Working on details
Working on details
Working on details
Working on details
Working on details
Working on details
Working on details
Working on details
Working on details
Working on details
Inspection of the refueling system
Inspection of the refueling system
Completion of body details except for additional protective blocks
This is the end of this episode and the video about this work is as follows.
#162
Thread Starter
This week, we completed welding to make the basket of turrets, and we are conducting operation tests and detailed work.
Horizontal angular main gun firing test
Horizontal angular main gun firing test
Horizontal angular main gun firing test
High angular main gun firing test
High angular main gun firing test
High angular main gun firing test
Turret rotation test
Turret rotation test
Turret rotation test
Balance weight, pneumatic valve, door switch test
Air-conditioning outdoor unit for turrets characteristic of desert type K2
Horizontal angular main gun firing test
Horizontal angular main gun firing test
Horizontal angular main gun firing test
High angular main gun firing test
High angular main gun firing test
High angular main gun firing test
Turret rotation test
Turret rotation test
Turret rotation test
Balance weight, pneumatic valve, door switch test
Air-conditioning outdoor unit for turrets characteristic of desert type K2
Last edited by PE YOUNG; 11-07-2023 at 11:36 PM.
The following users liked this post:
tankme (11-07-2023)
#163
Thread Starter
The air-cooled heat sink applied to the desert type of K2 CPS (Commander's Primary Sight) was added, and the work of DMRS (Dynamic Muzzle Reference System) and IFF (Identification Friend or Foe) was carried out.
DMRS is a laser fired into the reflector at the end of the main gun, but in this K2 model, it was made of a turret searchlight.
K2 desert type Commanser's primary Sight
Dynamic Muzzle reference system and Identification Friend or Foe
DMRS is a laser fired into the reflector at the end of the main gun, but in this K2 model, it was made of a turret searchlight.
K2 desert type Commanser's primary Sight
Dynamic Muzzle reference system and Identification Friend or Foe
#164
Thread Starter
K2 is undergoing detail work. In this photo, a smoke bomb and radar are constructed to be used for the turret's lower paint, handle, and softkill.
smoke bomb
smoke bomb
Last edited by PE YOUNG; 11-10-2023 at 04:23 PM.
#165
Thread Starter
Episode 33: Working on the turret detail
This week, K2 tank carried out power supply and various details.
Preparation for the creation of the turret rear basket
Preparation for the creation of the turret rear basket
Fabrication of baskets by welding
Fabrication of baskets by welding
Fabrication of baskets by welding
basket making work
basket making work
basket making work
basket making work
basket making work
basket making work
basket making work
basket making work
basket making work
basket making work
Finishing basket fabrication operationsbasket making work
Finishing basket fabrication operations
Weight preparation for main gun balancing
Weight preparation for main gun balancing
Weight preparation for main gun balancing
Weight preparation for main gun balancing
Check height of high angle after main gun weight installation of the main gun weight
Installation of high-power servo motor for main gun vertical control
Installation of high-power servo motor for main gun vertical control
Installation of servo arm and link rod
Preparation for the creation of the turret rear basket
Preparation for the creation of the turret rear basket
Fabrication of baskets by welding
Fabrication of baskets by welding
Fabrication of baskets by welding
basket making work
basket making work
basket making work
basket making work
basket making work
basket making work
basket making work
basket making work
basket making work
basket making work
Finishing basket fabrication operationsbasket making work
Finishing basket fabrication operations
Weight preparation for main gun balancing
Weight preparation for main gun balancing
Weight preparation for main gun balancing
Weight preparation for main gun balancing
Check height of high angle after main gun weight installation of the main gun weight
Installation of high-power servo motor for main gun vertical control
Installation of high-power servo motor for main gun vertical control
Installation of servo arm and link rod
#166
Thread Starter
주포 및 서보 링크 로드 완료 주포
수평각 운동 테스트 주포
고각 운동
테스트 5포트 공기 밸브를 포탑에
고정 공기 탱크를 포탑에
고정 공기 탱크를 포탑에 고정
터렛에 사용되는 와이어 터렛에
사용되는 와이어(서보에는 7V 전원 공급 장치가 있음)
터렛에는 12V, 5V, 3V의 세 가지 유형의 전원이 공급됩니다.
터렛에는 12V, 5V, 3V의 세 가지 유형의 전원이 공급되었습니다.
공기 압축기에는 55구경 주포
이동 시 12v 주포 분리 지점
, 검정색 밸런스 웨이트 제공
주포 연결 준비
주포와 포탑의 연결
검정색 밸런스 웨이트, 에어 호스 주포
에 에어 호스 연결 실린더 포탑
작동 테스트 포탑 작동
테스트
K2 사막 유형 지휘관의 기본 조준경
탱크 지휘관용 기관총 홀더
탱크 지휘관용 기관총 홀더
동적 총구 기준 시스템 및 아군 식별
동적 총구 기준 시스템 및 아군 식별
동적 총구 참조 시스템 및 식별 아군 또는 적군
#167
Thread Starter
Dynamic Muzzle reference system and Identification Friend or Foe
Dynamic Muzzle reference system and Identification Friend or Foe
Dynamic Muzzle reference system and Identification Friend or Foe
Main Gun Upper Cover
Main Gun Upper Cover
Detail Operation - Periscope Operation
Detail Operation - Periscope Operation
Detail Operation - Periscope Operation
Detail Operation - Periscope Operation
Detail Operation - Periscope Operation
Detail Operation - Periscope Operation
Detail Operation - Periscope Operation
Periscope for gunner
Machine gun holder
Paint the bottom of the turret
Paint the bottom of the turret
Sponge Tape for Gap Fillers
Installation of Sponge Tape for Gap Fillers
Gunner hatch, periscope
a periscope for gunner
Door of a periscope for gunner
Working with Details - Radar
Working with Details - Radar
Working with Details - Radar
Turret side painting
#168
Thread Starter
Detail work -Handle
Detail work-Handle
Detail work-Handle
Detail work-Handle
Detailed Work - Smoke Bombs, Radar
Detailed Work - Smoke Bombs, Radar
Detailed Work - Smoke Bombs, Radar, etc
Commander Hatch
Gunner Hatch
Commander Hatch Lock
Gunner Hatch Lock
Detailed Work - Wire Hook
Detailed Work - Wire Hook
Turret rear shell supply door
Turret rear shell supply door lock
urret rear shell supply door handel
Turret rear shell supply door
Armour for turret upper reinforcement
Silicone Formwork for Resin Making
Silicone Formwork for Resin Making
Silicone Formwork for Resin Making
Making resin armor
Making resin armor
Making resin armor
Making side armor
That's it for this week's production.
All production will be completed next week, and this desert version of K2 Black Panther Tank (iC2504) will be finished.
Last edited by PE YOUNG; 11-12-2023 at 06:23 PM.
The following users liked this post:
tankme (11-12-2023)
#169
Thanks for sharing your build. It is amazing!!!
The following 2 users liked this post by MAUS45:
PE YOUNG (11-17-2023)
The following 2 users liked this post by PE YOUNG:
Pah co chu puk (11-17-2023),
tankme (11-17-2023)
#173
Thread Starter
They've finally met since it's been almost a year!
My beloved brother has given me great joy for almost a year using his profession, handicraft technology. He put up the night to finish it off to send me K2 today and in the aftermath he was very tired and started to sleep deeply. I will give a cake of thanks to my beloved brother tomorrow.
My beloved brother has given me great joy for almost a year using his profession, handicraft technology. He put up the night to finish it off to send me K2 today and in the aftermath he was very tired and started to sleep deeply. I will give a cake of thanks to my beloved brother tomorrow.
Last edited by PE YOUNG; 11-18-2023 at 01:54 AM.
The following 2 users liked this post by PE YOUNG:
Pah co chu puk (11-19-2023),
tankme (11-19-2023)