Go Back  RCU Forums > RC Cars, Buggies, Trucks, Tanks and more > RC Tanks
Reload this Page >

1/5 scale K2 black panther tank

Community
Search
Notices
RC Tanks Discuss all aspects of rc tank building and driving here!

1/5 scale K2 black panther tank

Thread Tools
 
Search this Thread
 
Old 10-22-2023, 06:45 AM
  #151  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default


Connect air compressor to anti-vibration silicon pad and install on the back of shell storage storage storage

Connect air compressor to anti-vibration silicon pad and install on the back of shell storage storage storage

Operate the air compressor to check the vibration level

Operate the air compressor to check the vibration level

Air compressor noise is expected to be soundproof

Front Side Skirt Fixing Pin Position Move (Before)

Front Side Skirt Fixing Pin Position Move (After)

Installation of the artillery shield upper spacer and identification friend or foe

Installation of the artillery shield upper spacer and identification friend or foe

Complete installation of main Gun unit on turret

Check cover status when main gun is operated (Down position)

Check cover status when main gun is operated (Up posion)

Gunner Hatch Movement Test

Toolbox Door Test (Left)

Toolbox Door Test (Left)

Shell Supply Door Test

Shell Supply Door Test

Toolbox Door Test (Right)

Test of rotational motion of observation equipment for commanders

Hatches for Commander

Turret Shape Complete

Turret shape completed - Details after first painting

Remove the top plate to the right of the electrical wiring

Remove the top plate to the right of the electrical wiring

Check electrical components inventory and order any missing parts

Last edited by PE YOUNG; 10-22-2023 at 02:29 PM.
Old 10-22-2023, 06:55 AM
  #152  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default


Main control panel manufactured complete

Main control panel arrangement complete

The main wires started to connect

The wire connection work is very complicated

The wire connection work is very complicated

Main panel unit placed on the right rear side of the body

Main panel unit placed on the right rear side of the body

Main panel unit placed on the right rear side of the body

The cover for the main panel unit works like a picture

We are going on a business trip to install three baseball machines that we have requested to manufacture next week, so there will be no work in October.
I expect it to be completed in November.

The following users liked this post:
tankme (10-22-2023)
Old 10-29-2023, 06:34 AM
  #153  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default

Teaser of Episodes 32.
Before officially publishing the following tasks, I displayed the current work briefly.


Overall form of turret completed last time

Overall shape of turret completed last time (estimate size compared to 500CC can beer)

Wiring and arranging electronics on the body

Configuring electrical contact switches to operate on mechanical action

Engine exhaust corrugated duct

Engine exhaust muffler

Engine heat exhaust fans

Electronic component arrangement

Electronic component arrangement

Review generator output

Replace with a large fuel tank

Front manual charging wire connector

Side skirt support

Side skirt support (middle position)

Side skirt support (front right position)

Side skirt support (rear position)

Side skirt support (rear position)

Last edited by PE YOUNG; 10-29-2023 at 07:37 PM.
The following users liked this post:
Panther F (10-30-2023)
Old 11-01-2023, 01:14 AM
  #154  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default Heat exhaust interlocking control

In this version, two of the three heat exhaust fans at the back of the tank can be proportionally controlled by engine room temperature in order to maximize the electric energy of the generator using a brushless motor linked to the engine shaft.
When the engine is started, one out of three is always operated, and when the engine room temperature exceeds 60 degrees Celsius, fan 2 and fan 3 are operated sequentially.
If it goes below 60 degrees, the fan stops and the excess energy is stored in the battery.

Old 11-03-2023, 03:38 AM
  #155  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default

The K2 tank is being worked on in detail by division.

Headlight connections, left and right turn signals, etc

Dummy rear camera

Left taillights and exhaust muffler

Right taillights

Front light and binding bolts

Driver Hatch, Stopper, Light Sensor

APU DOOR AND DOOR HINGE

Door supporter

Last edited by PE YOUNG; 11-03-2023 at 06:43 PM.
Old 11-04-2023, 11:32 PM
  #156  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Talking Episode 32: Body Electrical Wiring and Detail Work

The video clips of the various detailed tasks released in the previous teaser are shown below.
In this work, power generation using engine power, various lights, and details were made on the upper part of the body.



Installation of side skirt supporters

Installation of side skirt supporters

Installation of side skirt supporters

Installation of side skirt supporters

Installation of side skirt supporters

Installation of side skirt supporters

Installation of side skirt supporters

Manufacture of exhaust gas mufflers

Manufacture of exhaust gas mufflers

Manufacture of exhaust gas mufflers

Manufacture of exhaust gas mufflers

Manufacture of exhaust gas mufflers

Manufacture of exhaust gas mufflers

Manufacture of exhaust gas mufflers

Manufacture of exhaust gas mufflers

Manufacture of exhaust gas mufflers

Manufacture of exhaust gas mufflers

Engine room heat exhaust fan operation

Engine room heat exhaust fan operation

Engine room heat exhaust fan operation

APU Switch test for exhaust system

Exhaust for muffler only

Engine room heat exhaust fan operation

Replace with a large fuel tank

Electronic component arrangement

Last edited by PE YOUNG; 11-05-2023 at 04:01 AM.
The following users liked this post:
tankme (11-05-2023)
Old 11-05-2023, 04:13 AM
  #157  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default


Electronic component arrangement

Electronic component and fan arrangement

Electronic component arrangement

Headlight operation test

Headlight operation test

Headlight operation test

Headlight operation test, this headlight can be turned on/off by illumination sensor and controller

the production of headlights

the production of headlights

the production of headlights

Headlight Operation Test

Headlight Operation Test

Headlight Operation Test

Installation of headlight supplementary tape

Installation of headlight supplementary tape

Headlight Operation Test

Headlight Operation Test

Headlight Operation Test

Headlight Operation Test

Installation of contact switch for brake

Installation of contact switch for brake

Positioning the receiver and control switch

Installation of the slipring and the left and right blinkers

Installation of the four contact switches on the left and right blinkers

Installation of the four contact switches on the left and right blinkers
Old 11-05-2023, 04:21 AM
  #158  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default


Wire connection operation

Wire connection operation

Wire connection operation

Wire connection operation

Wire connection operation

Wire connection operation

Wire connection operation

Wire connection operation

Wire connection operation

Confirmation of the slipring final plan

Position all control switches and receivers on the left front top

Position all control switches and receivers on the left front top

Alignment of slip ring wires

Alignment of slip ring wires

Alignment of slip ring wires

Production of rear light assembly

Production of rear light assembly

Production of rear light assembly

Production of rear light assembly

Determine the position of attachment to the rear light assembly

Determine the position of attachment to the rear light assembly

Production of rear light assembly

Attaching the rear light assembly

Attaching the rear light assembly

Attaching the rear light assembly
Old 11-05-2023, 04:29 AM
  #159  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default


Temperature sensor for engine compartment exhaust fan control

Temperature sensor for engine compartment exhaust fan control

Front left and right blinkers manufactured

Front left and right blinkers manufactured

Front left and right blinkers manufactured

Front left and right blinkers manufactured

Front left and right blinkers manufactured

Front left and right blinkers manufactured

Front left and right blinkers manufactured

Front left and right blinkers manufactured

Front left and right blinkers manufactured

Front left and right blinkers manufactured

power supply for testing

Brake light test

Brake light test

Left and right contact switch test

Right blinker test

Right blinker test

Left blink test

Left blink test

Blinking test

Blinking test

Test the operation of the receiver and control switch

Test the operation of the receiver and control switch

Charging to manual charging port
Old 11-05-2023, 04:36 AM
  #160  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default


Installation of illumination sensor exposure

Fixed the illumination sensor

Installing Receiver Antenna

Body Detail Operation

Body Detail Operation

Installing Stoppers for Driver Hatch

APU Cover Handle Welding

APU Cover Handle Welding

APU Cover Handle Welding

APU Cover Handle Complete

Rear reflector operation

Rear reflector operation

Detail Operation

Detail Operation

Detail Operation

Detail Operation

Detail Operation

Detail Operation

Detail Operation

Detail Operation

Detail Operation

Detail Operation

Detail Operation

Detail Operation

Detail Operation
Old 11-05-2023, 04:46 AM
  #161  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default

Next week, we plan to complete the turret detail again.

Working on details

Working on details

Working on details - refueling system

Working on details

Remove unnecessary holes

Remove unnecessary holes

Working on details

Working on details

Working on details

Working on details

Working on details

Working on details


Working on details

Working on details

Working on details

Working on details

Inspection of the refueling system

Inspection of the refueling system

Completion of body details except for additional protective blocks

This is the end of this episode and the video about this work is as follows.

Old 11-07-2023, 04:12 AM
  #162  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default

This week, we completed welding to make the basket of turrets, and we are conducting operation tests and detailed work.

Horizontal angular main gun firing test

Horizontal angular main gun firing test

Horizontal angular main gun firing test

High angular main gun firing test

High angular main gun firing test

High angular main gun firing test

Turret rotation test

Turret rotation test

Turret rotation test

Balance weight, pneumatic valve, door switch test

Air-conditioning outdoor unit for turrets characteristic of desert type K2

Last edited by PE YOUNG; 11-07-2023 at 11:36 PM.
The following users liked this post:
tankme (11-07-2023)
Old 11-08-2023, 10:27 PM
  #163  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default

The air-cooled heat sink applied to the desert type of K2 CPS (Commander's Primary Sight) was added, and the work of DMRS (Dynamic Muzzle Reference System) and IFF (Identification Friend or Foe) was carried out.
DMRS is a laser fired into the reflector at the end of the main gun, but in this K2 model, it was made of a turret searchlight.


K2 desert type Commanser's primary Sight

Dynamic Muzzle reference system and Identification Friend or Foe
Old 11-10-2023, 05:49 AM
  #164  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default

K2 is undergoing detail work. In this photo, a smoke bomb and radar are constructed to be used for the turret's lower paint, handle, and softkill.

smoke bomb

Last edited by PE YOUNG; 11-10-2023 at 04:23 PM.
Old 11-12-2023, 02:19 AM
  #165  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default Episode 33: Working on the turret detail

This week, K2 tank carried out power supply and various details.

Preparation for the creation of the turret rear basket

Preparation for the creation of the turret rear basket

Fabrication of baskets by welding

Fabrication of baskets by welding

Fabrication of baskets by welding

basket making work

basket making work

basket making work

basket making work

basket making work

basket making work

basket making work

basket making work

basket making work

basket making work

Finishing basket fabrication operationsbasket making work

Finishing basket fabrication operations

Weight preparation for main gun balancing

Weight preparation for main gun balancing

Weight preparation for main gun balancing

Weight preparation for main gun balancing

Check height of high angle after main gun weight installation of the main gun weight

Installation of high-power servo motor for main gun vertical control

Installation of high-power servo motor for main gun vertical control

Installation of servo arm and link rod
Old 11-12-2023, 02:41 AM
  #166  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default


주포 및 서보 링크 로드 완료 주포

수평각 운동 테스트 주포

고각 운동

테스트 5포트 공기 밸브를 포탑에

고정 공기 탱크를 포탑에

고정 공기 탱크를 포탑에 고정

터렛에 사용되는 와이어 터렛에

사용되는 와이어(서보에는 7V 전원 공급 장치가 있음)

터렛에는 12V, 5V, 3V의 세 가지 유형의 전원이 공급됩니다.

터렛에는 12V, 5V, 3V의 세 가지 유형의 전원이 공급되었습니다.

공기 압축기에는 55구경 주포

이동 시 12v 주포 분리 지점

, 검정색 밸런스 웨이트 제공

주포 연결 준비

주포와 포탑의 연결

검정색 밸런스 웨이트, 에어 호스 주포

에 에어 호스 연결 실린더 포탑

작동 테스트 포탑 작동

테스트

K2 사막 유형 지휘관의 기본 조준경

탱크 지휘관용 기관총 홀더

탱크 지휘관용 기관총 홀더

동적 총구 기준 시스템 및 아군 식별

동적 총구 기준 시스템 및 아군 식별

동적 총구 참조 시스템 및 식별 아군 또는 적군
Old 11-12-2023, 02:54 AM
  #167  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default


Dynamic Muzzle reference system and Identification Friend or Foe

Dynamic Muzzle reference system and Identification Friend or Foe

Dynamic Muzzle reference system and Identification Friend or Foe

Main Gun Upper Cover

Main Gun Upper Cover

Detail Operation - Periscope Operation

Detail Operation - Periscope Operation

Detail Operation - Periscope Operation

Detail Operation - Periscope Operation

Detail Operation - Periscope Operation

Detail Operation - Periscope Operation

Detail Operation - Periscope Operation

Periscope for gunner

Machine gun holder

Paint the bottom of the turret

Paint the bottom of the turret

Sponge Tape for Gap Fillers

Installation of Sponge Tape for Gap Fillers

Gunner hatch, periscope

a periscope for gunner

Door of a periscope for gunner

Working with Details - Radar

Working with Details - Radar

Working with Details - Radar

Turret side painting
Old 11-12-2023, 03:10 AM
  #168  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default


Detail work -Handle

Detail work-Handle

Detail work-Handle

Detail work-Handle

Detailed Work - Smoke Bombs, Radar

Detailed Work - Smoke Bombs, Radar

Detailed Work - Smoke Bombs, Radar, etc

Commander Hatch

Gunner Hatch

Commander Hatch Lock

Gunner Hatch Lock

Detailed Work - Wire Hook

Detailed Work - Wire Hook

Turret rear shell supply door

Turret rear shell supply door lock

urret rear shell supply door handel

Turret rear shell supply door

Armour for turret upper reinforcement

Silicone Formwork for Resin Making

Silicone Formwork for Resin Making

Silicone Formwork for Resin Making

Making resin armor

Making resin armor

Making resin armor

Making side armor

That's it for this week's production.
All production will be completed next week, and this desert version of K2 Black Panther Tank (iC2504) will be finished.


Last edited by PE YOUNG; 11-12-2023 at 06:23 PM.
The following users liked this post:
tankme (11-12-2023)
Old 11-15-2023, 12:43 PM
  #169  
MAUS45
 
MAUS45's Avatar
 
Join Date: Jul 2008
Location: Old Hickory, TN
Posts: 3,194
Received 38 Likes on 35 Posts
Default

Thanks for sharing your build. It is amazing!!!
The following 2 users liked this post by MAUS45:
PE YOUNG (11-17-2023)
Old 11-15-2023, 05:22 PM
  #170  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default

All the work is coming to an end

Marking

Painting work

Last edited by PE YOUNG; 11-16-2023 at 02:13 AM.
Old 11-15-2023, 05:23 PM
  #171  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default

The production process is all over this week.
Old 11-17-2023, 01:57 AM
  #172  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default




Last edited by PE YOUNG; 11-17-2023 at 02:56 AM.
The following 2 users liked this post by PE YOUNG:
Pah co chu puk (11-17-2023), tankme (11-17-2023)
Old 11-18-2023, 12:25 AM
  #173  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default

They've finally met since it's been almost a year!

My beloved brother has given me great joy for almost a year using his profession, handicraft technology. He put up the night to finish it off to send me K2 today and in the aftermath he was very tired and started to sleep deeply. I will give a cake of thanks to my beloved brother tomorrow.



Last edited by PE YOUNG; 11-18-2023 at 01:54 AM.
Old 11-19-2023, 07:54 AM
  #174  
PE YOUNG
Thread Starter
 
PE YOUNG's Avatar
 
Join Date: Mar 2009
Location: SEOUL, KOREA, REPUBLIC OF (KOR)
Posts: 213
Received 62 Likes on 46 Posts
Default The last episode

We've finally finished our 10-month-long production.

The following 2 users liked this post by PE YOUNG:
Pah co chu puk (11-19-2023), tankme (11-19-2023)
Old 11-19-2023, 08:37 AM
  #175  
Pah co chu puk
 
Pah co chu puk's Avatar
 
Join Date: Apr 2010
Location: Ridgway, CO
Posts: 3,234
Received 144 Likes on 94 Posts
Default

That is a work of art. Thank you for sharing the build with us.
The following users liked this post:
PE YOUNG (11-19-2023)


Contact Us - Manage Preferences - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service -

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.